Electric Car Charger Installation in Chattanooga, TN
Fast, code-compliant Level 2 home charging for Tesla, Ford, Chevy, Hyundai, Rivian and every other EV, installed by a licensed Chattanooga electrician.
Charging on a standard 120-volt outlet adds only a few miles of range per hour. A Level 2 charger on a dedicated 240-volt circuit can fill most batteries overnight. Foster Electric has installed home and workplace EV chargers across Hamilton County since the first plug-in cars hit Chattanooga roads, and we handle everything from the load calculation to the final inspection.
Financing available through Wisetack: projects up to $65,000, and checking your options won’t affect your credit. See financing options.
Get a Free Quote
Tell us about your project and we’ll call you back. Prefer to talk now? (423) 892-6759
What our EV charger installation includes
Every job starts with a free on-site estimate. We check your panel capacity, measure the run from the panel to your garage or driveway, and recommend the right amperage for your vehicle and driving habits.

- Load calculation to confirm your panel can carry the new circuit
- Dedicated 240-volt circuit (40 to 60 amp) with the correct wire size and breaker
- Hardwired or NEMA 14-50 outlet installation
- Tesla Wall Connector, ChargePoint, Emporia, Grizzl-E, JuiceBox and other brands
- Indoor garage or weatherproof outdoor mounting
- Permit and inspection with the City of Chattanooga or Hamilton County
Does my Chattanooga home need a panel upgrade first?
Many homes in Brainerd, Highland Park and North Chattanooga still run on 100-amp panels. An EV charger can be the load that tips an older panel over its limit. If your panel is full or undersized, we will tell you up front and price a panel upgrade or a load-management device so you can charge safely without tripping breakers.
Charging for businesses and multi-family properties
We also install commercial EV stations for offices, apartment communities and retail lots. Our commercial electricians can plan multiple stations, trenching and metering so your property is ready for tenants and customers who drive electric.
Serving Chattanooga, East Ridge, Hixson, Red Bank, Signal Mountain, Lookout Mountain, Ooltewah, Collegedale and Soddy-Daisy and all of Hamilton County.

EV Charger Installation FAQs
How long does an EV charger installation take?
Most garage installations with a short wire run are finished in half a day. Longer runs, outdoor trenching or a panel upgrade can add a day.
Can I use the charger that came with my car?
Yes. Many EVs ship with a portable charger that plugs into a NEMA 14-50 outlet. We can install that outlet on a dedicated 240-volt circuit, or hardwire a wall-mounted charger for faster charging.
Do you pull the permit?
Yes. We pull the electrical permit and schedule the inspection so your installation is documented and insured.
Need ev charger installation in Chattanooga? Call Foster Electric at (423) 892-6759 for a free estimate. Financing available.
